18 CAH-SVX01B-EN
Installation - Mechanical
TCP Model Assembly Instructions
If the model number on the nameplate begins with TCP, use the assembly instructions below. The
TCP base is constructed for specific installation requirements such as standard roof curbs,
structural support curbs, steel I-beam dunnage support, and pier mounting.
NOTICE
Roof Curb Structurally Sound
Check with curb manufacturer and job engineer to ensure the roof curb is structurally sufficient
to support the weight of the unit. The curb should be checked to ensure it is level and square.
Curb bowing, buckling, or sagging can lead to unit assembly and operation problems up to
complete failure.
TCP Standard Roof Curb
Figure 4. Standard roof curb The TCP unit exterior base channel is
constructed to overhang the roof curb. Unit
support is provide by a square tube channel
locate inside of exterior base channel. See
Figure 4. The standard curb should be designed
to properly support the unit’s weight without
bow and sized to fit within the perimeter base
channel.
For large units shipped in sections, see
additional requirements in “TCP Roof Curbs for
Large Units with Shipping Splits” on page 21.
Air handler
base structure
Roof curb
Insulation